AIR7000 Maritime Patrol Aircraft Replacement Phase 2B – Non-Airside Works

The 17,500sqm AIR7000 training and support facility prepares air and ground crew for the replacement of the RAAF 92WG PC-3 Orion Maritime patrol aircraft with the Boeing P-8A Poseidon aircraft. Located at RAAF Base Edinburgh, the site contains No. 92 Wing and No. 292 Squadron Headquarters, administration facilities, ceremonial spaces and a 300-seat theatre.

Continue reading

Campbelltown Library

When the $8 million refurbishment of Campbelltown City Council’s municipal library opened to the public, it provided an immediate increase in visitor rates. The new library doubled in size to include a children’s library with a feature storytelling tree, toy library, youth area, quiet study areas and open lounge spaces.

Continue reading

Geelong Grammar School Wellbeing Centre (Toorak)

Geelong Grammar’s new state-of-the-art Wellbeing Centre at their Toorak campus is designed to appeal to the entire school community; with an indoor swimming pool as the key drawcard.

Continue reading

Toongabbie Station Access Upgrade

The upgrades to Toongabbie Station improve the access of the station for all sections of the community including people with a disability, carers with prams, older persons, children, students and commuters.

Continue reading

Glenbrook Station Upgrade

Located in the Blue Mountains, Glenbrook Station has high heritage values and a unique bushland setting. As part of the NSW Government’s Transport Access program (TAP), Glenbrook Station was upgraded to be more welcoming and equitable, while retaining the existing character and heritage values of the site.

Continue reading

Holy Family Catholic School Administration Building

The Administration Building serves as the new ‘front door’ to the school. A large, open-plan environment, where student access is encouraged, incorporates smaller spaces for discreet meetings and team activities.

Continue reading

University of South Australia Sport Science Centre + Exercise Clinic

This small footprint project at UniSA’s City East Campus upgrades the School of Health Sciences infrastructure with a High-Performance Sport Science Centre and Exercise Physiology Clinic.

Continue reading

BAE Systems Canberra Office

The new office for BAE Systems Australia centrally locates business units in Canberra’s CBD. The new workplace provides a collaborative environment that reflects a professional corporate identity.

Continue reading

BAE Systems JSF (Joint Strike Fighter) Large Titanium Machining Facility

BAE Systems JSF (Joint Strike Fighter) Large Titanium Machining Facility is a government-funded facility that machines titanium aircraft components. It features heavy industrial construction and advanced manufacturing infrastructure.

Continue reading

George Bolton Swimming Centre

The existing 1966 building, located in heritage listed Hazelwood Park, was completely renovated, with new entrance, plant room and upgraded disability access.

Continue reading